Sunsational Sunscreen

Author Image

By: TOM BRANNA

Editor

Sunsational Sunscreen
Ingredients
%

Phase A

  • Deionized Water
  • 61.60
  • Dissolvine 220-S (Coast Southwest, Akzo-Nobel Functional Chemicals) (Tetrasodium EDTA)
  • 0.10
  • Endicare SC-520Q (Coast Southwest) (Polyethyloxazoline)
  • 2.00

Phase B

  • Endicare TN (Coast Southwest) (C12-15 alkyl benzoate)
  • 1.00
  • Olivatis 12 (Coast Southwest) (Polyglyceryl-3 pentaolivate)
  • 1.00
  • Olivatis 13 (Coast Southwest) (Polyglyceryl-3 cetearyl ether olivate)
  • 5.00

Phase C

  • Uvasorb MET (Coast Southwest, 3V Inc.) (Benzophenone-3)
  • 3.00
  • Octyne-B (Coast Southwest, Clariant) (Octocrylene)
  • 2.00
  • Avis (Coast Southwest, Clariant) (Butyl methoxydibenzoylmethane)
  • 2.20
  • Homosalate (Coast Southwest) (Homomenthyl salicylate)
  • 8.00
  • Viv-OS (Coast Southwest, Clariant) (Ethylhexyl salicylate)
  • 3.00
  • Cinnamon (Coast Southwest, Clariant) (Ethylhexyl methoxycinnamate)
  • 5.00
  • Vitamin E (Coast Southwest) (Tocopherol acetate)
  • 1.00

Phase D

  • Olivatis 15 (Coast Southwest) (Olive oil glycereth-8 esters)
  • 2.00
  • Medxtract Carrot 1:4 Lipo (Coast Southwest, Medolla Italia) (Daucus carota root extract (and) helianthus annuus (sunflower) seed oil)
  • 1.00

Phase E

  • Sharomix 706 Plus (Coast Southwest, Sharon-Laboratories) (Dehydroacetic acid (and) benzoic acid (and) natural vitamin E (and) benzyl alcohol)
  • 0.60

Phase F

  • Endicare ETP-305 (Coast Southwest) (Polyacrylamide (and) C13-14 isoparaffin (and) laureth-7)
  • 1.50

Procedure

Phase A – Add Phase A to main vessel with shear mixing. Begin heating to 75-80°C. Phase B – In a separate vessel, add Phase B with shear mixing and begin heating to 75-80°C. Phase C – When Phase B reaches desired temperature, add Phase C to Phase B and continue mixing with heat to 75-80°C. Hold heat and ensure uniformity of sunscreens. Once both vessels reach 75-80°C add Phase BC to Phase A with high shear mixing. Begin cool down. Phase D – Premix Phase D in a separate vessel. When main vessel has cooled to 45-50°C add Phase D to main vessel and continue mixing until uniform. Phase E – Add Phase E to main vessel and continue shear mixing until uniform. Phase F – When batch has cooled below 40°C, add Phase F under high shear mixing. Note: Allot time for batch to thicken and reach uniformity. Transfer to final container.

Properties

pH—5.5-6.0; Viscosity—spindle 5 at 5 rpm = 65,000-70,000 cst; Estimated SPF value available upon request.

More Information

Coast Southwest, Inc. 800-621-0500 Email: [email protected] Website: www.coastsouthwest.com